| Issue |
MATEC Web Conf.
Volume 418, 2025
12th International Symposium on Occupational Health and Safety (SESAM 2025)
|
|
|---|---|---|
| Article Number | 00019 | |
| Number of page(s) | 8 | |
| DOI | https://doi.org/10.1051/matecconf/202541800019 | |
| Published online | 18 December 2025 | |
Current trends in the authorization of personnel for activities related to explosive atmospheres
National Institute for Research and Development in Mine Safety and Protection to Explosion - INSEMEX, 32-34 G-ral Vasile Milea Street, Petrosani, Romania
* Corresponding author: adriana.andris@insemex.ro
Technological installations used for the processing, handling, or storage of flammable substances, such as flammable gases and vapours, or combustible dusts, may generate explosive atmospheres in their vicinity. Depending on their probability of occurrence and persistence, these explosive atmospheres are split into zones according to specific standards. To ensure an adequate level of operational safety, such installations must be designed, installed, operated, maintained, and repaired by personnel who are qualified and authorized for related activities. At the beginning of the paper is presented the explosion-related risk associated with the activities carried out by the personnel involved is presented, as well as the importance of professional authorization for the domain of risk of explosion locations. The second part highlights the legislative framework and authorization procedures relevant for the Romanian context. The paper ends with the results and discussions from data analysis available from the authorization process in Romania, together with the current trends identified in this field.
© The Authors, published by EDP Sciences, 2025
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.

